With the implementation of the project, the former level crossing was replaced by a grade-separated interchange, allowing A15 road traffic to cross the railway without interruptions. During the reconstruction, a new overpass was built, ensuring safer and smoother traffic, reducing vehicle delays, and improving both railway and road safety. This solution enhanced connectivity and contributed to the more efficient development of transport infrastructure in the region.