Reconstruction of the A1 Motorway Vilnius–Kaunas–Klaipėda, section from km 27.56 to km 56.97

Project title

Technical Project for the Reconstruction of National Motorway A1 Vilnius–Kaunas–Klaipėda, section from km 27.560 to km 56.970, in the Elektrėnai Municipality

Completed projects
Rangos darbai
Construction type
Rekonstravimas
Project Location
Elektrėnai Municipality
Builder
Lietuvos automobilių kelių direkcija
fegda group companies
Fegda, Tilsta, SRP projektas
Completed
2021
Parameters
Asphalt pavement laid: 53,292 m² | Paving block surface: 3,610 m² | Wildlife fencing: 31.89 km | Underground crossings: 2 units

Reconstruction of the A1 National Motorway (Vilnius–Kaunas–Klaipėda) in the Elektrėnai Municipality

The existing A1 motorway section connecting Vilnius, Kaunas, and Klaipėda in the Elektrėnai Municipality is being reconstructed to meet motorway safety and traffic requirements. This reconstruction is highly important for both traffic safety and capacity increase and will significantly improve connectivity infrastructure.

Main project objective – to upgrade the existing expressway to motorway standards, thereby ensuring improved traffic safety, smoother driving conditions, and increased permissible speed.

Key project measures:

  • Upgrade of median barriers: Existing safety barriers in the central reservation will be replaced with higher containment level barriers, ensuring compliance with motorway standards, greater safety, and reduced accident impact.

  • Improved geometry of acceleration and deceleration lanes: These lanes will be reconstructed to motorway standards, allowing smoother and safer merging and exiting.

  • Wildlife protection: Fencing will be installed along the entire road section to prevent wildlife from entering the carriageway, improving safety.

  • Pedestrian underpasses: New underground crossings will ensure safe pedestrian movement across the road without interrupting traffic flow.

  • Reconstruction of exits: Existing access ramps will be reconstructed with proper acceleration and deceleration lanes, ensuring safe and efficient connectivity.

Technical solutions:

  • Road widening: The carriageway will be widened to motorway parameters, providing sufficient capacity for higher traffic volumes.

  • Safety measures: Additional measures will include new lighting systems, upgraded road markings, and automatic traffic monitoring systems.

  • Engineering networks and drainage: Utility networks and drainage systems will be upgraded to ensure proper water management and infrastructure durability.

Project benefits:

  • Enhanced traffic safety: With upgraded barriers, improved acceleration lanes, and safe pedestrian crossings, safety will be improved for both drivers and pedestrians.

  • Smoother and faster traffic: Road widening and new safety measures will allow for increased speed limits (from 110 km/h to 130 km/h), reduced travel time, and better service quality.

  • Economic benefits: The reconstruction will boost regional economic growth, enhance trade and tourism opportunities, and ensure efficient transport flow.

  • Greater safety and comfort: The project will improve conditions for both local residents and transit travelers, ensuring safer, more convenient journeys.

Conclusion
The reconstruction of the A1 motorway in the Elektrėnai Municipality is a strategically important project that not only improves traffic safety but also optimizes transport flows, strengthens regional economic development, and provides long-term benefits for both local communities and international transit.