Due to complex geological conditions, it was decided to reinforce the road embankment to ensure long-term stability and traffic safety.
The works carried out included the installation of driven piles with pile caps, the placement of a frost-resistant material layer, and the reinforcement of the road structure with geosynthetic materials. These solutions improved the road’s durability, reduced the risk of deformations, and ensured reliable connectivity along this section.